CESP: Emergency section

utility

The largest simultaneous fall of structures ever found damaged a 13.5 km stretch of the 440kV electrical transmission line of CESP – Companhia Energética de São Paulo. To quickly re-establish the network and reduce the inconvenience that this power outage causes to the population, Delta Towers were used as an emergency, an ideal solution for this type of situation due to its versatility and agility in assembly. This was the largest stretch of emergency network ever assembled in Brazil.